In a residential development, lift use is typically spread throughout the day, with peaks in the morning and evening, and the lift may also need to accommodate prams, furniture and other bulky items. In office buildings, demand is often concentrated at particular times, making speed and call allocation more important. These differences can affect the equipment configuration and price, so the lift should be selected for the actual usage scenario of the building.
Frequently asked questions
Answers about selecting, manufacturing, installing, modernising and servicing lift equipment.
Typical requirements may include reliable communication with the dispatcher, clear indicators, convenient call control and a passenger evacuation system in the event of a power failure. Such a system can move the lift cabin to the nearest floor and open the doors using backup power. Other functions depend on the class of the building and the customer’s requirements. Options should not be added simply to make the specification longer - the manufacturer can help assess whether each function is appropriate for the specific project.
Yes. Lift doors are among the components that operate most frequently, so their quality can affect the number of faults and the overall operating performance. The mechanism, materials and quality of adjustment can also influence noise and durability. Door selection should therefore take the expected intensity of use into account.
The technical characteristics should be compared item by item rather than only by the final price. Particular attention should be paid to the number of stops, lift cabin and door parameters, speed, control system and lift cabin finish. If the initial requirements differ, they should first be brought to the same basis.
It depends on the class of the building and the expectations of its users. In business- or comfort-class developments, the lift is often part of the first impression, so a higher-quality finish can be justified. In more budget-focused projects, durability and practicality of the materials may be more important. The right balance can be determined together by the manufacturer and developer.
Yes, if the changes affect parameters that may be related to equipment installation. Once such work is complete, the actual dimensions should be updated and checked against the current documentation. The manufacturer should receive the revised data rather than the previous measurement results. This is particularly important before the lift configuration is finally approved.
Door openings form part of the building interface for the equipment at each stop. Even when the project specifies identical openings, their actual dimensions may differ after construction work is completed. The dimensions should therefore be recorded separately for each floor and provided together with the other project data. This allows the actual condition of the building to be taken into account during technical assessment.
The shaft parameters should ideally be coordinated during the design stage, before construction work is carried out that would be difficult to alter later. Once the shaft has been built, the design values should be checked against actual measurements. This allows current project data to be used when selecting the equipment. The exact coordination process depends on the stage of project implementation.
It is advisable to prepare up-to-date building and shaft drawings, together with any available actual dimensions of completed structures. Information on the number of floors, number of stops, travel height and door openings will also be required. If changes have been made to the project, the manufacturer should receive the latest version of the documentation. The full list of required input data can be clarified during a technical consultation with Euroformat.
The quality and scope of service can affect fault prevention, response times and the duration of downtime. A lower-cost contract with unclear obligations may lead to additional costs if response times are slow or extra call-outs are charged separately. It is important to compare response times, the scope of work and spare parts availability as well as price.
Yes. Downtime means a period when residents cannot use the equipment, so it is an important operating factor for a residential building. Before ordering, it is worth finding out how diagnostics, repairs and spare parts support are organised. Euroformat has a technical support division covering these areas.
Replacement intervals depend on the specific model, operating load and maintenance conditions. The manufacturer may be able to provide indicative replacement intervals for key components. It is worth including a separate contingency for such costs so that component replacement does not become an unexpected expense. Regular maintenance also helps identify and plan future replacement needs.
Still looking for an answer?
Write to us — an engineer will answer technical questions about your project.