Why two lifts with the same rated load can have different prices

To understand what determines the price of a lift, it is not enough to compare rated load alone. The final configuration is influenced by the number of stops, speed, lift cabin dimensions, doors, drive, control system, finishes and additional functions.

Read →

What to check in the lift shaft before ordering a lift: a checklist for developers

Before ordering a lift, it is important to know not only the design dimensions of the shaft but also its actual dimensions. Even small discrepancies can affect the choice of lift cabin, doors and equipment configuration.

How much does it cost to own a lift: purchase, electricity, repairs, spare parts and maintenance

The total cost of owning a lift includes more than the purchase of the equipment. It also includes installation, electricity, maintenance, repairs, spare parts and the consequences of downtime. This is why lifts should be compared not only by their initial price, but by the full range of future costs.

The lift has already been ordered, but the shaft parameters have changed: what to do

If the lift shaft parameters have changed, the new dimensions should be recorded, the drawings updated and the revised information sent to the manufacturer immediately. Whether the equipment can be adjusted is determined after a technical assessment, taking into account the nature of the changes and the current stage of the order.

Ordering a lift too late: how it affects the construction schedule

When deciding when to order a lift for a construction project, it is important to consider more than just the installation date. Before installation, the equipment parameters and drawings need to be agreed, the shaft must be ready, and production and delivery must be organised. Ordering too late can affect the sequence of work on site.

5 lift costs that are often overlooked when planning a budget

When planning lift costs, it is important to consider more than just the equipment itself. The budget can also be affected by shaft preparation, installation and commissioning, energy consumption, maintenance and, during operation, repairs and spare parts.

Why the cheapest lift offer can become the most expensive after the building is commissioned

The lowest purchase price does not necessarily mean the lowest long-term cost. Lift price and operating costs depend on the configuration, maintenance conditions, repairs, spare parts availability and other parameters of the specific equipment.

Types of lift doors: how to choose

Types of lift doors should be selected together with the lift cabin and shaft parameters, number of entrances and requirements of the specific project. The door configuration affects how access to the lift cabin is organised, so this decision should ideally be made during the design stage.

Passenger lift cabin dimensions: what determines them

Passenger lift cabin dimensions are not determined separately. They need to be considered together with the shaft parameters, rated load, number of entrances, door dimensions and the requirements of the specific building project. This is why selection should begin at the design stage.

How many people can a passenger lift accommodate?

There is no single answer to how many people a lift can accommodate for every model. Passenger capacity is linked to the rated load and the parameters of the specific lift cabin, so the characteristics of the selected equipment should always be checked.

Partial reimbursement of the cost of domestically produced industrial machinery and equipment

Partial reimbursement of the cost of domestically produced industrial machinery and equipment Learn more