Yes. A vision panel will usually affect the overall weight of the door leaf compared with a solid construction without glazing. This may influence the choice of hardware, hinges and installation method, so these details should be agreed together with the glazing parameters. The exact characteristics depend on the specific door model.
Frequently asked questions
Answers about selecting, manufacturing, installing, modernising and servicing lift equipment.
First, the proposed product should be compared with the project requirements and the required fire resistance rating. The construction, configuration and availability of documentary confirmation of the declared characteristics should also be checked. This makes it possible to assess the proposal according to specific parameters rather than the EI60 designation alone.
The same EI60 designation does not mean that all door constructions have the same design or configuration. The requirements for a specific product depend on the project solution. The characteristics and configuration should therefore be checked separately for each order.
Yes. EI60 door assemblies can have specific installation requirements, so the geometry of the opening and wall thickness should be compatible with the selected model. These parameters should be agreed with the manufacturer before ordering to avoid problems during installation. The exact requirements depend on the specific door construction.
No. The product name does not replace confirmation of its technical characteristics. It is important to make sure that the supporting documentation applies to the specific door construction being selected. This is particularly important when purchasing doors to meet project requirements.
The number in the designation should not be treated according to the principle that “higher is better”. The required rating is linked to the requirements of the specific project. Before ordering EI30 or EI60 doors, the project documentation should therefore be checked to confirm which solution is required.
If the project specifies this particular rating, it should be stated when selecting and ordering the product. This makes it possible to check from the outset that the door meets the required characteristics. The fire resistance rating should be agreed together with the other parameters of the specific order.
No. The requirements depend on the type and purpose of the space and on the regulations applicable to the specific project, whether it is a residential building, office building or technical room. The project documentation may specify different fire resistance ratings for different areas within the same building. The specific project requirements should therefore be followed rather than relying on a general assumption.
No. The material a door is made from does not by itself confirm a particular fire resistance rating. The declared characteristics of the specific door and the documentation confirming them should be checked. Standard metal doors and fire-rated doors should therefore not be treated as the same type of product.
The first step is to define the equipment that will be installed inside the enclosure. Its layout, connections and installation conditions should then be considered. Only after this can the enclosure dimensions be assessed in the context of the specific technical specification.
The installation location is an important part of the technical specification for the enclosure. It should be considered together with the equipment configuration, connection method and environmental conditions. The final configuration should therefore be agreed after all the initial project data has been defined.
BETABOX-ST should be considered when the project requires a stainless steel enclosure. This may be due to environmental conditions or specific requirements for the equipment design. The final choice should be made after assessing the actual installation conditions.
Still looking for an answer?
Write to us — an engineer will answer technical questions about your project.